2X BMS Soft Parallel Connecting VIA P-LINK Module

2X BMS SOFT PARALLEL CONNECTING VIA P-LINK

The accessories and connectings

BMS CONNECTING DIAGRAM

1) bms settings from the settings page.

A).master bms setting addr to 0 as the pic.and the cap is 83.4AH.so from the master page,you can check the total cap as on pack.

B).slave bms setting addr to 1 as the pic.and the cap is 40AH.

C).You can also check the LCD from our testing,the total cap is 84.3AH.

D).You can also check our protocol build in the app.

this is the settings from the 2X bms with HC function and soft parallel connecting via P-link module.any questions and requests please feel free to contact us direclty as below:

📧 service@jkbms-ess.com 📱 WhatsApp: +1 818 938 3175 🌐 jkbms-ess.com


Back to blog