JKBMS PB V19 Wiring and App Setup Guide
Estimated reading time: 29 minutes
Distribuie
This guide covers JKBMS PB V19 installation, battery power connections, cell-sensing wires, temperature sensors, displays, app settings, inverter communication, and commissioning. Always follow the wiring diagram for your exact BMS model, hardware revision, and cell count. Do not apply V19 connector arrangements to V15 or other hardware versions.
Battery cells and busbars remain live even when the BMS is switched off. Installation must be performed by a suitably experienced person using insulated tools and appropriate protection. A BMS does not replace correctly rated DC fuses, isolation devices, or safe installation practices.
1. Identify Your BMS and Accessories
Check the complete model number, hardware revision, battery chemistry, actual series cell count, and capacity. Identify the main board, interface board, sensing harnesses, temperature probes, interface-board cables, B+ supply lead, and supplied activation connection. Displays and computer cables depend on the purchased configuration.

Package overview: main board, interface board, wiring harnesses, and accessories. Check your exact model and supplied configuration before installation; this overview does not replace the wiring diagram.
2. Identify the Main-Board and Interface-Board Connections
The following three illustrations show the main-board connections, interface-board layout, and interface-board harness pin definitions. Match the illustrations to your actual hardware revision before connecting anything. Tap each image to inspect the labels at full size.
Main-Board Connection Overview
- Temperature-sensor and balance-cable connectors: the sensing and temperature harness connections along the upper-left edge. Use the exact cell-count diagram and verify every sensing voltage as described in Sections 5 and 6.
- HEATING: the optional heating connection. See Section 14 before using this circuit; do not confuse it with the main battery or load terminals.
- BAT− / B−: the main battery-negative connection.
- Load output− / P−: the protected negative connection for external loads and charging equipment.
- BAT+: the BMS positive supply connection. It is not the inverter's main positive-current terminal.
- Interface-board connections: the lower-left connector group identified by the illustration, including the P1, P2, and P3 area. Use the matching supplied harnesses and check connector orientation.
- LCD and switch connections: the lower-edge connections identified by the illustration. Match the actual PCB labels and accessory cable; do not infer a connector's function from its shape alone.
Use a compatible PB-series TTL-P display, such as the appropriate LCD-4.3-TTL-P or LCD-7.0-TTL-P. Do not substitute a B/BD-series RS485 display. Connect the display to the matching main-board display port. The main-board UART/display connection is not the computer monitoring connection.
Interface-Board Layout
- Reset button: shown at the left and labeled “Rest” in the illustration. Follow the model's operating instructions; this image does not specify its press duration or reset behavior.
- DIP switch: the four-position switch block. Use the exact manual's address-setting instructions; do not guess the switch combination.
- Dry contacts: the four-terminal block labeled “Dry Contactor.” See the optional-function notes at the end of this guide, in Section 14.
- RS485-1 and CAN: the left-hand pair of RJ45 communication sockets. RS485-1 is used for the computer connection described in Section 12, or for compatible inverter communication with the corresponding protocol and cable; CAN is used for compatible CAN equipment.
- UART3: the separate middle RJ45 socket. Keep it distinct from the main-board display connection and the RS485-1 computer connection. This layout does not specify its accessory compatibility or pin assignments; leave it unused unless the exact model documentation specifies the intended connection.
- RS485-2: the two right-hand RJ45 sockets, used for inter-pack communication. The computer connection in this guide uses RS485-1. See Section 12 for computer and multi-pack setup.
- Indicators: positions labeled RUN, ALM, and L1–L6 are shown along the lower edge. Consult the model's indicator-status instructions to interpret their lighting or flashing patterns.
- ON/OFF marking: shown at the lower-left position. Match the supplied activation arrangement to the actual interface board; do not bridge unidentified pins.
Computer connection: connect a compatible USB-RS485-RJ45 cable to RS485-1 and follow the connection and protocol settings in the PC connection, battery monitoring and firmware guide linked in Section 12. Do not use a USB-TTL cable connected to a PB display port. PB models already include CAN and RS485 communication; a B/BD-series RS485 expansion module is not required to add these functions. An RJ45 socket does not imply Ethernet or interchangeable wiring.
Interface-Board Harness Pin Definitions
- Connector group 1: the two-row connector diagram identifies indicator-related signals, address-related signals, GND, RS485-1 A/B, and CAN H/L. Read both rows in the orientation shown; do not treat the drawing as a single left-to-right pin sequence.
- Connector group 2: the six-position connector is labeled GND, GND1, RS232 TX/NC, RS232 RX/NC, RS485-A2, and RS485-B2 in the illustrated view. The TX/NC and RX/NC labels do not establish that RS232 is available on every hardware version.
- Connector group 3: the ten-position connector includes GND, NC, ON/OFF-LED, LED6, LED5, COM2, S2, COM1, and S1 labels in the illustrated view. Follow the exact drawing and matching harness rather than assigning external loads or switch wiring from these names alone.
Pinout precautions: connector viewing direction matters. These harness drawings are not RJ45 socket pinout diagrams. Do not transfer their pin positions to the external communication sockets. NC-marked positions must not be assigned an assumed function. Use the original harnesses; custom cables require the exact hardware-specific pinout at both ends.
3. Prepare for Installation
Prepare a suitable multimeter, insulated tools, and correctly rated cables, terminals, DC fuses, and isolation devices. Disconnect the inverter, charger, and other loads. Cover exposed live terminals that are not being worked on. Mount the BMS securely and prevent contact between conductive parts and the enclosure.
Select cable sizes and protective devices for the complete system, not just the BMS current rating. Use the terminal tightening specifications for the actual hardware; do not assume a universal torque value.
4. Connect the Battery, BMS, and Inverter Power Cables
Cells in Series, Complete Packs in Parallel
Inside one battery pack, connect each cell's positive terminal to the next cell's negative terminal. Series connection adds voltage while the Ah capacity stays the same for matched cells. 8S means eight series cell positions; 16S means sixteen. Each complete pack is managed by its own BMS.
For capacity expansion, connect compatible complete packs in parallel: each pack's positive terminal connects through its own suitable protection to the common positive busbar, and each BMS-protected P− output connects to the common negative busbar. For example, two matched 16S LiFePO4 packs, each 51.2 V nominal / 100 Ah, form a 51.2 V nominal / 200 Ah bank. These are nominal examples, not charging settings.
Concept diagram: the left panel uses two cells to illustrate the repeating series link, not a complete PB battery pack. The right panel shows complete packs in parallel. Use matched branch cables and connections to keep each pack's total current-path resistance as consistent as possible. Verify pack compatibility, polarity, and an acceptable voltage difference before connection; provide suitable fuses and isolation. BMS sensing wires and communication cables are omitted. Do not series-connect complete PB packs. Tap the image to view it at full size.
Main Power Connections
- B−: connects to the battery pack negative terminal.
- P−: connects to the negative terminals of the inverter, charger, and other external loads.
- Battery positive: connects to external equipment positive through appropriately rated protection and isolation devices.
- BMS B+ supply terminal: connects to battery positive according to the exact model's diagram. This is the BMS supply connection, not an inverter main-current terminal.
Do not connect the charger or load negative directly to battery negative in a way that bypasses P−. Distinguish the main power cables from the smaller BMS supply wire.

JK-PB2A16S20P V19 wiring example for a 16S battery pack. Follow the diagram for your exact hardware revision and battery configuration. External fuses and isolation devices must be selected and installed as required by the system design; they are not shown in this illustration.
5. Connect the Cell-Sensing and Balancing Wires
Leave the sensing plugs disconnected from the BMS while attaching and checking the battery-side wires. For a 16S example, B0 connects to pack negative, B1 to the first series group's positive, B2 to the second group's positive, and so on up to B16 at pack positive.
16S series-connection example: B0 is pack negative and B16 is pack positive. B1–B15 mark the successive junctions between series cells, not separate battery packs. In this layout, follow B0 through B8 across the upper row, then B9 through B16 along the lower row; the right-hand B8 link joins the two rows into one series string. B8 is an intermediate junction in this 16S example, not the pack-positive endpoint used in the separate 8S measurement photographs below. Confirm the actual cell polarities and every sensing voltage before connecting the harness to the BMS. This photograph illustrates cell interconnections, not a complete protected system. Tap it to view the labels at full size.
A series group counts as one cell position even when several cells are connected in parallel within that group. V19 sensing connectors also include temperature-sensor pins and reserved positions. Do not treat every pin as a cell-voltage connection. Connector colors help identification but never replace the PCB markings and original pin definitions.
For a supported PB V19 configuration with fewer than 16 series groups, follow the original diagram for the actual cell count and leave the unused cell-sensing pins unconnected (open). Do not bridge them. Secure and insulate any unused wire ends so they cannot contact one another, live terminals, or the enclosure. This applies to unused cell-sensing positions, not required temperature-sensor or other functional connections.

Close-up of the PB V19 cell-sensing and temperature-sensor wiring. Match each connector to the PCB markings; do not rely on connector colors alone.
6. Measure Every Sensing Connection Before Plugging It into the BMS
Strictly follow the wiring sequence for your exact configuration. After attaching the sensing wires to the battery, keep the harness disconnected from the BMS and measure the voltages at the harness connectors. Check every active sensing point, not only the three examples shown below. Record each reading before proceeding.
The following photographs demonstrate measurements on an 8S lithium battery pack. They are separate from the 16S wiring example above. For this 8S measurement example, keep the black probe on B0 and measure B1, B2, B3, B4, B5, B6, B7, and B8 in sequence with the red probe. For other supported configurations, check every active point up to the actual pack's final series connection using the correct original wiring diagram.
- Record the cumulative voltage from B0 to each active sensing point. These readings must increase progressively as you move from B1 toward the final series connection.
- Also check adjacent sensing points, such as B0–B1 and B1–B2. Each adjacent reading must match that individual series group's measured voltage. Adjacent single-cell readings are not expected to increase progressively.
- Confirm that the final cumulative reading matches the independently measured total pack voltage.
- Stop if any reading is reversed, unexpectedly near zero, skips a cell, or disagrees with the corresponding battery measurements. Increasing readings alone do not prove the wiring is correct.
![]() B0–B1: 3.792 V |
![]() B0–B2: 7.59 V |
![]() B0–B8: 30.34 V |
8S measurement examples only. These readings are not target voltages, charging recommendations, or protection settings. Your readings depend on the actual cell chemistry, state of charge, and configuration. Tap a photograph to view it at full size.
WARNING: Do not insert a sensing connector into the BMS until every connection and voltage has been verified. Incorrect sensing-wire order or polarity can cause electrical breakdown and permanent damage to the BMS monitoring circuitry, leaving the BMS unusable. Never plug in the harness to test whether uncertain wiring is correct.
Use DC voltage mode and the correct meter input sockets. Prevent the probes from bridging adjacent pins. Connect the harness to the BMS only after all checks pass, following the original installation procedure for the exact revision.
7. Temperature Sensors and the Interface Board
Distribute the NTC temperature probes around the battery: on all four side faces, or on the top and three side faces, to measure battery temperature at different locations. Secure the probes firmly in contact with the battery surfaces using PTFE (Teflon) tape or polyimide tape. Do not place or fasten them on busbars or terminal studs.
Connect the interface board using the matching supplied harnesses, checking orientation and latches. Do not interchange cables from other series merely because the plugs look similar.
Connected startup example: the PB main board is connected to the interface board and display. The display and interface-board indicators are illuminated, and the activation button is visible at the lower right. This photograph shows the connected accessories and powered display, not a complete battery-to-inverter installation or a pin-by-pin wiring diagram. Follow the diagram for your exact model and hardware revision; an illuminated display alone does not confirm that all wiring and protection settings are correct. Tap the photograph to view it at full size.
8. Activate the BMS and Connect the App
Recheck polarity, sensing voltages, B−, P−, B+ supply, and temperature connections. Keep high-power loads isolated during initial setup. Activate the BMS using the supplied button or display as specified for the model. If using charger activation, the charger must remain within the battery's approved chemistry, cell-count, and voltage requirements; do not raise its voltage arbitrarily.
Obtain the matching app through the original manual or Download Center. Enable Bluetooth and the required phone permissions. The manuals list the factory Bluetooth password as 1234 and the parameter authorization password as 123456. These are separate passwords; use the current credentials if they have been changed.
Screenshot scope: the following app images illustrate an 8S, 50 Ah example whose Home and Status pages identify NCM/NCA chemistry. They are interface demonstrations, not recommended settings for your battery and not LiFePO4 settings. Screen labels and available controls can vary by app and firmware version. Tap each image to inspect it at full size.
You can use the app's one-tap battery-type preset to set the main parameters for the correct battery chemistry. This is a starting point only: detailed battery parameters still need to be entered or adjusted for your actual battery and cell specifications, and every relevant setting must be checked before operation.
Find the Device and Log In
- Open the Bluetooth device list and search for your own BMS. Check the device identity before selecting it, especially when several packs are nearby.
- Select the correct device. If the Login dialog appears, enter its current Bluetooth connection password and confirm with OK.
- Wait for live readings, then verify that they correspond to the battery you intended to connect.
Bluetooth device list. The device name is obscured in this example; select your actual BMS rather than identifying it solely by signal strength.
Connection Login dialog. This is separate from authorization to change protection settings.
Read Home and Status Before Changing Settings
Home overview: SOC, voltage, current, charge/discharge and balance states, highest and lowest cell voltage, voltage difference, capacity, and temperature. This example shows 74% SOC, about 30.26 V, and 0.00 A. The orange “Click to view alarm” prompt is visible: this is not an alarm-free commissioning example. Open the alarm information and resolve the actual cause before putting the system into service. The screenshot alone does not identify that cause.
Status detail: compare total voltage, individual cell readings, temperatures, current, and balance-wire readings with the actual battery measurements. This 8S example shows active readings for cells 1–8; unused cell positions are not additional connected cells. T4/T5 show NA in this image; whether unused temperature channels are appropriate must be checked against the actual configuration. Zero current at idle is not proof of correct current measurement under load.
Authorize Settings and Keep the Two Passwords Separate
In Settings, the illustrated Quick section provides “Verify Pwd.” before authorization. Open it and enter the current settings password, then press Verify. After authorization, this example shows “Change Pwd.” for changing the settings password.
Settings authorization. Do not confuse this password with the Bluetooth Login password.
To change the settings password, use the old password, new password, and confirmation fields shown, then confirm with OK. Securely retain the new password and keep it out of published screenshots.
The device-list edit menu has separate rename and password entries. This is the connection-side menu, not the “Change password of settings” dialog above. This image does not show the subsequent Bluetooth password-change form.
App Menu and About Entry
The upper-right menu shown includes System log, Detailed log, History of Version, Privacy and Protocol, Language Settings, Bluetooth Upgrade, Bind display screen, and About. This is a menu screenshot, not the opened About page. A visible upgrade or binding entry does not establish compatibility with every BMS or display; do not use these entries as a shortcut around model-specific instructions.
9. Configure the Initial App Parameters
Download Parameter Settings Reference (PDF) — For Reference Only
For reference only: the values in this PDF are examples, not universal recommended settings. Do not copy them directly. Confirm every parameter against your actual battery chemistry, series cell count, capacity, cell specifications, BMS model and hardware revision, and system requirements. This reference does not replace the model-specific manual or the cell manufacturer's specifications.
Save screenshots of the existing settings first. Record both battery-protection parameters and communication values, including Device Address and CAN/UART selections. Use the one-tap preset for the correct battery type to set the main parameters, then enter or adjust the detailed battery parameters according to the actual battery and cell specifications. Review every relevant setting afterward; a preset alone does not prove that the configuration suits your cells.
- Set the actual battery chemistry and series cell count.
- Enter the Ah capacity of the pack managed by this BMS. Series connections do not increase Ah. Do not enter the complete parallel bank capacity into every individual pack's BMS.
- Check cell overvoltage, undervoltage, and their recovery thresholds.
- Set continuous charge and discharge current limits within the capabilities of the cells, BMS, cables, terminals, and other system components.
- Check low-temperature charging protection, charge/discharge overtemperature protection, and recovery thresholds.
- Review SOC voltage references, recommended charging voltage, and any applicable float settings.
- Set balance start voltage, balance trigger difference, and maximum balancing current for the actual model and cells.
Use the cell manufacturer's specifications and system design for voltage and temperature limits. Generic manual defaults are not universal recommendations, especially for cold charging and temperature protection. In this app version, individual editable fields have an OK control. Submit each intended change using its corresponding control, then read the value back to confirm it was accepted. Do not assume typing a value saved it.
Quick Controls and Core Parameters
The Quick section shows NCM/NCA, LFP, and LTO shortcuts; Import/Export shows parameter-file controls; Control includes charge, discharge, Emergency, Dis-Limiter, and LCD Always On. Core Parameters show Cell Count 8 and Capacity 50 Ah in this example. These are this pack's displayed values, not instructions to configure every pack as 8S/50 Ah. Do not import another battery's settings without checking every relevant value and hardware compatibility.
Balancing and Voltage Protection
Identify Balancer, Bal. Delta Volt., Bal. Start Volt., and Max. Bal. Current separately from cell overvoltage/undervoltage protection, recovery thresholds, and SOC voltage references. The pictured 4.200 V cell overvoltage value belongs to the displayed NCM/NCA example and must not be copied into a LiFePO4 configuration. The same caution applies to all other values in the screenshot.
Current and Temperature Protection
Review continuous charge/discharge limits together with overcurrent delays and recovery times. The displayed 100 A values are not a universal safe current rating. Temperature protection and its recovery thresholds require the actual cell specifications. Do not enable “Disable battery temp” to hide a sensor or wiring problem.
This continuation shows charge/discharge temperature limits and recovery values, MOS temperature protection, and short-circuit delay/recovery controls. The pictured sub-zero charging threshold is not a recommendation for LiFePO4 or any other cell. Use cell-approved temperature limits; do not copy the pictured delays or disable short-circuit protection to bypass a fault.
Calibration, Time, and History Are Not Routine Setup Shortcuts
The page includes CycleCapacity calibration, Time Calibration, Erase History Data, and connection-wire resistance adjustment fields. These editable compensation fields are not the same as the measured balance-wire readings on Status. Leave calibration and compensation unchanged without a verified procedure. Erasing history removes diagnostic evidence and is not a routine fault-clearing step.
10. Configure Balancing and Normal Operation
Balancing only starts when its switch and triggering conditions are satisfied. No immediate balance current does not automatically indicate a fault. Check the start voltage, cell-voltage difference, and sensing-wire condition before troubleshooting the balancing function. The balancing controls are illustrated in Section 9; compare the switch setting with the actual balance status and current on Home or Status.
Enable normal charging and discharging only after checking readings and settings. Keep precharge appropriate for the connected load. Do not use the Emergency switch as a routine way to clear faults: it overrides normal protection. Do not suppress temperature-sensor alarms or disable short-circuit protection to make an alarm disappear. Do not change sensor ranges or calibration factors without a verified calibration procedure. The charge, discharge, and Emergency controls are shown in Section 9's Quick Controls image.
11. Set Up Inverter Communication
Match the inverter's battery voltage range, communication interface, protocol, and firmware requirements before connecting it. A protocol name or brand entry alone does not confirm compatibility with every model. The support-list image below is the reference for the listed equipment and test status; individual models are not repeated here.
Inverter Support List
Tap the support list to read it at full size. Distinguish the protocol entries from the real-device testing column. An entry marked untested, or without a matched model, must not be presented as a tested installation. Confirm the exact equipment and current manufacturer guidance before commissioning.
Choose the Correct Port and Protocol
- Identify whether the inverter requires CAN or RS485 battery communication. Use the matching PB interface-board CAN or RS485-1 socket and the inverter's designated battery communication port, not a LAN, meter, or parallel-link socket.
- Check the signal pinout and connector viewing direction at both cable ends. For CAN, preserve CAN-H to CAN-H and CAN-L to CAN-L; do not assume identical RJ45 pin numbers or a standard Ethernet cable. For RS485, follow the documented signal assignments and serial settings.
- Connect to the correct PB through Bluetooth and open the app's communication settings. Select the supported protocol for the actual connected interface. CAN selection and UART/RS485 selections are separate; do not substitute one for another.
- Set the inverter's matching battery communication profile. A generic Lithium setting alone may not select the required protocol. Use closed-loop communication when that is the intended setup, rather than a Without COMM mode.
- Confirm each setting using the control provided, read it back, and follow the model-specific restart and startup procedure if required. Battery chemistry, series count, capacity, and protection limits must already match the actual battery.
This example locates the separate CAN and UART protocol fields. It shows CAN 000, UART1 010, a greyed UART2 value 21, and UART3 015; these are not universal inverter settings. Protocol names are truncated on this screen. Check the full selected name on your device rather than copying a number from another app or firmware version. Set each communication channel for the equipment actually connected to it.
The same screen includes Charge Float Mode, RCV Time, Cell RFV, and factory-only voltage/current/SOC/SOH calibration. These are separate from inverter protocol selection. Do not change factory calibration to force an expected SOC or voltage display.
CAN Protocol Selection Screens
The following two display-menu photographs show the CAN protocol choices. These are display screens, not Bluetooth-app screens; menu entries and numbers may differ with app, display, or firmware version. Tap each image to view the labels at full size.
CAN menu, first page: JK BMS 250K, Deye, PYLON, Growatt, Victron, MEGAREVO, and JK BMS 500K entries are visible. The PYLON choice is 002 — PYLON-low-voltage-V1.2 in this example. The Deye label is truncated; check the full selection on the actual device. A menu entry alone is not a tested compatibility statement.
CAN menu, second page: entries 007–011 show INVT, GoodWe, FSS-ConnectingBat, MUST, and LuxpowerTek protocol labels. Match the exact protocol and equipment requirements rather than selecting by brand name alone.
RS485 Protocol Selection Screens
The following two photographs show the separate RS485 protocol menu. Select an RS485 profile only for the corresponding RS485 connection. An LCD or remote-module protocol in this menu is not automatically an inverter protocol.
RS485 menu, first page: the visible entries include the remote-module protocol, JK BMS Modbus, battery cabinet, PACE, PYLON, Growatt, and a truncated Voltronic label. 005 — PYLON_low_voltage_Protocol_RS485_V3.5 is an RS485 option, not PYLON CAN.
RS485 menu, second page: WOW Modbus, JK BMS LCD, 9600-baud JK BMS Modbus, 014 — (9600)PYLON_low_voltage_Protocol_RS485_V3.5, and the PBxx LCD protocol are visible. The LCD entries are display communication options, not substitutes for an inverter's required battery protocol. Missing protocol numbers are not shown in these photographs; no additional menu entries are assumed.
Inverter Not Listed: When to Consider PYLON
An absent brand or model is not a reason to select PYLON automatically. First obtain confirmation from the inverter's manual or manufacturer that the exact model and firmware support the corresponding PYLON/Pylontech low-voltage battery communication profile.
- CAN connection: only when PYLON CAN is confirmed, select the matching PYLON CAN option on the PB and the corresponding CAN battery profile on the inverter. The CAN menu pictured above lists 002 — PYLON-low-voltage-V1.2; 002 belongs to that menu version, not every firmware version.
- RS485 connection: only when PYLON low-voltage RS485 is confirmed, select the matching RS485 protocol and serial settings. The RS485 menu pictured above lists 005 — PYLON_low_voltage_Protocol_RS485_V3.5 and 014 — (9600)PYLON_low_voltage_Protocol_RS485_V3.5. Select according to the inverter's required settings, not because its brand is missing from the list.
- Do not mix the interfaces: PYLON CAN and PYLON RS485 are different options. Match protocol, communication speed, cable pinout, and inverter-side configuration. Selecting a Pylontech profile does not make a DIY battery an approved Pylontech battery.
The pictured support list marks its PYLON CAN entry as not real-device tested. Treat a non-listed installation as requiring model-specific confirmation and commissioning, not as guaranteed compatibility. If the manufacturer cannot confirm the required profile or pinout, stop and obtain technical support rather than trying unrelated protocols or uncertain wiring.
Verify Communication and Troubleshoot
Compare the inverter's live battery data with the app: SOC, voltage, current direction and magnitude, temperature, charge/discharge permissions, and BMS limits where exposed. Check for active communication alarms. Voltage alone, or merely the absence of an alarm, does not prove working BMS communication. Begin with controlled low-current tests within the ratings of the cells, BMS, cables, and inverter.
If communication fails, isolate equipment before changing wiring. Recheck the designated ports, signal mapping, protocol and speed, retained settings, and any required restart. For parallel packs, also check the exact master/address, inter-pack wiring, and termination requirements. Do not randomly flash firmware or cycle through unrelated battery profiles. Provide support with the inverter model/firmware, PB model/revision, interface-board labels, alarm text, protocol screenshots, and checked cable pin mapping.
12. Connect a Computer or Multiple Packs
Computer Connection and Battery Monitoring
For illustrated USB-RS485 connection, PC software downloads, CH340 driver installation, COM port selection, and viewing battery status, read our JKBMS PB PC Connection, Battery Monitoring and Firmware Update Guide. The guide includes the Realtime battery-status page, Settings, Control, Logging, and About screens, as well as a separate firmware-update walkthrough.
To view battery status, connect the USB-RS485-RJ45 cable to RS485-1, follow the PC connection instructions, and then open the Realtime section. You do not need to perform a firmware update just to monitor the battery. Follow that guide's confirmed address, UART protocol, and COM-port settings together; do not combine them with a different connection arrangement. Keep firmware updating separate from normal monitoring, and restore the installation's required communication settings after any temporary changes.
Multiple Packs
Power parallel connections and communication parallel connections are separate. Complete each pack's wiring, settings, and low-current testing independently first. Confirm system compatibility, polarity, and an acceptable voltage difference under the system design before making power connections. Each pack needs suitable protection and isolation.
The V19 manual supports RS485-2 addresses 0–15, with address 0 as master and 1–15 as slaves, up to 16 units. Addresses must be unique. For two packs, this gives one master at address 0 and one slave at address 1. Apply the exact hardware's address-setting procedure and verify each unit separately. P-LINK-CR is a B/BD accessory and must not be substituted for a PB interface board.
Data and Communication shows Device Address 0, greyed in this example, plus timed data storage and user-data fields. The image does not demonstrate editing the address; follow the exact board's address-setting procedure. Smart Sleep and emergency-related fields above it are separate operating features, not communication protocol selectors.
Configure each unit's communication channels for their actual connected equipment; do not copy every CAN/UART value from one unit to another as a universal parallel-system preset. Save and verify each unit's own configuration. After firmware changes, recheck each unique address and the CAN/RS485/display selections before returning the system to service.
Photo Example: Two 8S Packs with a Main and Slave Unit
The following images are reused from our two-pack PB parallel setup example. They document one setup with the main unit on the left and slave unit on the right. They are not a complete construction diagram or universal settings for all PB hardware and firmware. Tap each image to view it at full size.
System overview: two PB boards with their interface boards and one display. The blue cable links the interface boards for communication; it is not a battery power cable. Battery cells, complete power wiring, fuses and isolation are not shown, so this photograph must not be copied as a complete protected installation.
Main and Slave Interface Boards
Main-unit interface-board example. Identify the actual RS485-2 port labels and use the exact revision's inter-pack wiring and address procedure. The photograph does not establish cable pin assignments, termination requirements, or a universal DIP-switch combination.
Slave-unit interface-board example. Give each unit its own unique address and verify it individually. Keep the inter-pack communication connection separate from the inverter and computer connections described above.
Compare Main and Slave App Addresses
Main-unit app: Device Address 0. In this particular screenshot CAN is 000, UART1 and UART3 are 015, and UART2 displays 21. This is a record of that example, not a required preset for every main unit.
Slave-unit app: Device Address 1. The screenshot shows CAN 000, UART1 and UART3 015, and UART2 001. The UART2 field differs from the main-unit screenshot. Do not copy these channel values into another installation or combine them with Section 11's UART1 010 example. Match each connected device's full protocol and the exact hardware documentation.
Check Detected Packs on the Display
The overview reports Packs: 2. An Alarm indication is also visible, so this is a display-navigation example, not an alarm-free acceptance result. Identify and resolve the actual alarm before service; the photograph alone does not establish its cause. The pictured capacity, SOC and voltage are example readings, not settings or proof that aggregation is configured correctly.
The group page shows two battery-group icons. Open each pack and check its identity, capacity, SOC, cell voltages, temperatures and alarms individually. Seeing two icons does not replace the electrical checks and controlled tests in Section 13.
13. Commission and Troubleshoot the System
Start with low-current charging and then low-current discharging. Observe cell voltages, temperatures, current direction, and terminal heating before increasing the load gradually. Verify the actual cell count, sensible readings, no sensing or temperature alarms, and correct inverter communication and operating limits.
For a parallel system, confirm the detected pack count and inspect each pack's capacity, SOC, cell voltages, and alarms independently. An aggregate overview does not replace individual-pack checks. Use the Home and Status images in Section 8 to identify fields, but do not treat their example readings or visible alarm prompt as proof of successful commissioning.
SOC may require a normal operating cycle to calibrate. Never overcharge or deeply discharge a pack simply to force the display to 100% or 0%.
- No startup: check supply, sensing connections, and the supplied activation wiring. Do not bridge unidentified pins.
- Readings but no output: inspect charge/discharge controls and the specific protection condition. Do not force emergency operation.
- No balancing: check its switch, voltage thresholds, cell-voltage difference, and sensing-wire condition.
- No communication: check ports, protocols, speed, addresses, and pin assignments.
- Protection during startup: rule out an actual short circuit and check precharge and load requirements before changing settings.
V15 and V19 firmware must not be cross-flashed. Firmware flashing should not be the first response to a wiring or communication problem.
14. Optional Heating and Dry Contacts
These optional functions are separate from the basic wiring and commissioning sequence. Leave unused optional circuits disconnected and their associated controls unconfigured. Download and read the exact protection-board manual before adding an external heating or dry-contact circuit.
The V19 HT− terminal is the heater negative, not B−, P−, or B+. Check heater supply arrangements, voltage, power, and current against the exact hardware diagram and provide suitable independent temperature and circuit protection.
The screenshot locates Dsg Heat, Heater Test, heater start/stop temperatures, intermittent alarm, LCD buzzer trigger/release settings, and dry-contact trigger fields. These displayed values are examples, not a heater wiring specification or approved contact-load ratings. Do not run Heater Test without verifying the installed heating circuit. DRY2 continuation fields appear at the top of Section 12's screenshot.
Dry contacts: these are control contacts, not power outputs. External equipment requires a suitable supply. Confirm terminal pairing, normally open/closed behavior where applicable, contact voltage/current ratings, and the external circuit against the exact hardware manual before connection. Do not connect an external load based on the app screenshot alone. Configure trigger source, trigger value, and release/recovery value to suit the verified external circuit.
For detailed heating and dry-contact wiring, use the original diagrams in the exact protection-board manual linked below. This general guide does not provide a directly reproducible external-load circuit or replace the hardware-specific ratings.
Download the Protection-Board Manual and Get Technical Support
Before installation or changing optional functions, download and carefully read the protection-board manual matching the full model number and hardware revision. Use the app parameter manual alongside it for setting definitions. Images in this guide illustrate specific examples and do not replace the original wiring diagrams, pin definitions, electrical ratings, and configuration instructions. Do not apply V19 instructions or firmware to V15 hardware.
Download PB V19 User Manual
Download App Parameter Settings Manual
Download Parameter Settings Reference (PDF) — For Reference Only
Download Inverter Support List
For other models or revisions, find the corresponding manual in the Download Center: https://jkbms-ess.com/pages/support
Email: service@jkbms-ess.com
WhatsApp: https://wa.me/18189383175
When requesting help, provide the full BMS model, hardware revision, battery chemistry, cell count, capacity, inverter model, clear wiring photographs, and app alarm screenshots.